• Weymouth North Sea Wall

    Good value, high quality materials and service

Weymouth North Sea Wall

Weymouth North Sea Wall

Client - Heidelberg Materials Contracting
Value - £705,000.00
Duration - 40 weeks
Profile Number - 23/53

Download Full Case Study (PDF)

Suttle Projects were instructed to refurbish the sea wall within Weymouth harbour. The scope of works entailed:

  • Repointing works
  • Concrete repairs 
  • Spray Concreting

We also cast a reinforced concrete upstand to the top of the wall, the purpose of this was to raise the flood defence level to maintain protection against a 1 in 100 year flood event.